by Steven | Jun 16, 2025 | Feature Story, French Blog
Underground water levels in Kakula Mine stabilized; dewatering to commence in Q3 2025 Kamoa Copper revises 2025 production guidance to between 370,000 and 420,000 tonnes of copper Smelter start-up expected to commence in September 2025, with first anode anticipated in...				
					
			
					
											
								
							
					
															
					
					 by Steven | May 28, 2025 | Feature Story, French Blog
Phase 1 and 2 concentrators continue operating, supplied by stockpiles Operations at Kamoa Mine and Phase 3 concentrator continue normal operations Kamoa Copper and Ivanhoe Mines and Zijin committed to restore Kakula Mine back into production as soon as safely...				
					
			
					
											
								
							
					
															
					
					 by Steven | May 20, 2025 | Feature Story, French Blog
Operations at Phase 1 and 2 concentrators continue at reduced capacity from surface stockpiles. Operations at Kamoa mine and Phase 3 concentrator continue uninterrupted. KOLWEZI, DEMOCRATIC REPUBLIC OF THE CONGO – Kamoa Copper SA reports today that mining operations...				
					
			
					
											
								
							
					
															
					
					 by Steven | May 19, 2025 | French Blog
Kolwezi, Democratic Republic of Congo – May 12, 2025 – Kamoa Copper, a leading company in the DRC mining industry, today announced a significant leadership transition within its Board of Directors and Executive Committee. After a distinguished tenure, Kamoa Copper’s...				
					
			
					
											
								
							
					
															
					
					 by Steven | May 9, 2025 | English Blog, Feature Story, Featured
The mining industry does not always seem appealing to the younger generation, it is therefore an important mission for mining companies to seed the will and excitement to ensure that succession happens. Kamoa Copper’s mine life is estimated around more than 40 years ,...